Take a Note Record Lite Project Planner
See more from Take a Note
Couldn't load pickup availability
DESCRIPTION
- The left page of the project planning page is a vertical date from top to bottom, and the right page is rotated 90 degrees to a horizontal date from left to right. The two formats can be derived for a variety of applications. Vertical dates can be bullet notes and project plans, and horizontal dates can be habit tracking, mood records, and can be used according to your own habits.
- The original square note page of the RECORD series is covered with 4mm squares. A single square is most suitable for writing foreign languages, while a double square (8mm) can be used to write Chinese comfortably. With a 2mm mini square and positioning points around the page, it is easy to draw Three-point line, four-quadrant and other formats.
- The cover is made of art paper specially made by a century-old paper mill in the UK. The color is full, the touch is natural and simple, the texture is tough and solid, and it is not easy to be damaged when you carry it around. The cover can also support standing writing after being concave and folded.
- The inner page is made of Japanese high-grade hand account paper - 68 lbs Tomoe River paper. The pen cannot write through, and the drawing and stamping have perfect performance.
The LITE notebooks in the RECORD series have four practical styles: monthly plan, weekly plan, project plan and MEMO PAD note book. They can be used in combination with other products in the RECORD series. notebook.
The LITE project planning journal of the RECORD series is a multi-purpose notebook that can be flexibly used in project planning, bullet journaling, itinerary planning, and habit tracking.
The 40-page project plan is matched with the SMART GRID functional checkered note page, fully presenting the consistent characteristics of TAKE A NOTE, creating a functional notebook with a detailed, non-interfering design. practical goodies.
Open the project planning page, the writing space is covered with very light-colored 2mm squares, and the height is 4mm every day, which is convenient for drawing lines and positioning and aligning.
The left page is a vertical date from top to bottom, and the right page is a horizontal date from left to right after rotating 90 degrees. Users can use it freely and flexibly. For example: write travel records on the left page and habit tracking on the right page. You can also write down your personal itinerary while recording your business affairs.
If your order contains both in-stock products and pre-order products, your order will be shipped when pre-order products are stocked. Please place orders separately if you would like to receive in-stock products first.